Industries · Oil & Gas
Traceable, verifiable and complete.
PHMSA expects pipeline material records to hold up for the life of the line. Limestone ties every joint of pipe and every fitting to its material data and test history, so the records exist before anyone asks for them.
The rules you work under
What the regulation asks of you, and where Limestone fits.
PHMSA
49 CFR 192 (Mega Rule)
What it requires
- Keep records of pipe and component properties (diameter, wall thickness, seam type, grade) that are traceable, verifiable and complete, for the life of the pipeline §192.607(b) ↗
- Where those records are missing, verify material properties by testing whenever pipe is exposed §192.607(c) ↗
- Reconfirm maximum allowable operating pressure where records fall short in high-consequence and Class 3 or 4 locations §192.624(a)(1) ↗
How Limestone helps
- Tie each joint of pipe and each fitting to its heat number and material properties
- Flag segments and components with gaps in their records
- Pull the material and pressure-test records an MAOP reconfirmation depends on
See your material records connected.
We’ll walk through it on your own data.