Industries · Food & Beverage
Traceability that’s ready before the FDA calls.
When a recall or a records request lands, you need to know exactly which lots went where. Limestone keeps lot-level traceability current across your ERP and production data, so answers take minutes, not days.
The rules you work under
What the regulation asks of you, and where Limestone fits.
21 CFR Part 1, Subpart S
FSMA 204 Traceability
What it requires
- Record key data elements (traceability lot code, quantity, product, location, date) at every receiving, transformation and shipping event §1.1325–1.1350 ↗
- Assign a new traceability lot code whenever you transform a food §1.1320(a) ↗
- Give the FDA an electronic, sortable spreadsheet within 24 hours of a request §1.1455(c)(3) ↗
How Limestone helps
- Capture key data elements from the ERP and production systems you already run
- Link lots through every transformation, from ingredient to finished product
- Pull the sortable record the FDA asks for without a scramble
See your lots traced end to end.
We’ll walk through it on your own data.